Firbank Grammar School Arts Precinct

Location

14 Middle Crescent, Brighton

Duration

June 2021 – March 2022

Value

$5.5 million

Client

Firbank Grammar School
Architect
Peddle Thorp Architects
Superintendent
RP Infrastructure
The new Louis Williams Arts Precinct provides a technology-rich environment that incorporates state-of-the-art design and reimagines the relationship this original heritage building has to the school.

This refurbishment and extension has transformed an original school hall built in 1909 into a significant cultural and creative arts precinct dedicated to all forms of creativity including performance, dance, digital and studio arts.

With state-of-the-art facilities and acoustically designed spaces, it is the newest addition to the precincts of the Brighton Campus.

The project entailed the refurbishment and reconfiguration of existing classroom spaces and construction of new specialist spaces including a lecture theatre and ceramics facility all tied back into the existing building.

Firbank Grammar School Arts Precinct

Location

14 Middle Crescent, Brighton

Client

Firbank Grammar School

Duration

June 2021 – March 2022
Architect
Peddle Thorp Architects

Value

$5.5 million
The new Louis Williams Arts Precinct provides a technology-rich environment that incorporates state-of-the-art design and reimagines the relationship this original heritage building has to the school.

This refurbishment and extension has transformed an original school hall built in 1909 into a significant cultural and creative arts precinct dedicated to all forms of creativity including performance, dance, digital and studio arts.

With state-of-the-art facilities and acoustically designed spaces, it is the newest addition to the precincts of the Brighton Campus.

The project entailed the refurbishment and reconfiguration of existing classroom spaces and construction of new specialist spaces including a lecture theatre and ceramics facility all tied back into the existing building.

Harris HMC were extremely easy to deal with, their communication and transparency really made it easy for us. They were reliable and continually hit the standards set by the school.

Here are some other projects we think you'd like

Other projects completed with Firbank Grammar School

No data was found

Ready to partner with us?

Search

52 Henderson Street
North Melbourne VIC 3051

+61 3 9328 8900
enquiries@harrishmc.com.au

Follow us on social media

Stay Connected
Search