With the library remaining operational throughout delivery, works included external roof replacement; semolition of internal structural brick wall; installation of structural steel; make good existing floor; replacement of external windows; plasterboard lining to all internal walls; eelocation of existing electrical meter; installation of new floor clovers, light fittings and joinery; and painting throughout.