As part of Stage 1B being delivered across 6.5 hectares, electrical works included excavation and civil works including all footings and approximately 2km trenching; supply and installation of Philips OptiVision LED floodlighting system to oval and court areas and incorporating PerfectPlay intelligent control systems; supply and installation of car park and pathway lighting; supply and installation of two switchboards connecting all associated infrastructure; dull electrical fitout to newly constructed pavilion including architectural lighting; installation of 51 solar panels and automatic heat pump system to pavilion roof; testing and commissioning.